(EnergyAsia, June 29) — Singapore’s PEARL Energy Limited said it has completed its third delineation well in the Bussabong Production Area Application in the Block B 12/32 contract area in the Gulf of Thailand. The Bussabong 8B delineation well was drilled to a total depth of 8,285 feet from a surface location approximately nine…
THAILAND: PEARL Energy provides update on its Gulf of Thailand exploration drilling programme
Posted on June 29, 2005 by EnergyAsia