(EnergyAsia, February 9) — A 210-MW coal-fired power plant on the Philippine island of Mindanao recently passed local and international standards of boiler pressure test conducted by contractor STEAG-State Power Inc. (SPI).   “The successful conduct of the tests means that the boiler of the power plant passed all applicable local and international standards of…

This article is for Subscriber members only.
Register
Already a member? Log in here