(EnergyAsia, February 6) — Australia’s hydroelectricity output has been drastically reduced as a result of an on-going severe nationwide drought. A hydro-electric power plant in Victoria state had to be shut down recently while another experienced an output cut due to low water levels. The AGL Dartmouth unit on the Mitta Mitta river…
AUSTRALIA: Victoria state’s hydro output cut on low water levels
Posted on February 14, 2007 by EnergyAsia