Construction of Oryx GTL, Qatar’s first gas-to-liquid (GTL) project, at Ras Laffan is about 38% completed and on schedule to be operational by December 2005, reported the Gulf Times. Oryx GTL’s 33,000 b/d plant is jointly owned by Qatar Petroleum and South Africa’s Sasol. As the largest and most technically advanced GTL facility in the…
QATAR: Oryx GTL plant on schedule for completion in December 2005
Posted on July 19, 2004 by EnergyAsia