(EnergyAsia, October 15 2010, Wednesday) — Singapore is developing its liquefied natural gas terminal (LNG) in phases, starting with an initial capacity to handle over nine million tons with the potential to rise to as much as 12 million tons if the need arises. Due to start up in 2013, the terminal’s capacity already exceeds…
SINGAPORE: LNG terminal being developed to allow for future expansion
Posted on October 14, 2010 by EnergyAsia