(EnergyAsia, September 10 2012, Monday) — The Chinese designer and builder of a Sri Lankan coal-fired power plant said the operator failed to undertake any maintenance, causing it to break down several times since its start-up in March 2011. Northwest Electric Design Institute (NEDI) and builder China Machinery Engineering Corporation (CMEC), which have both been…

This article is for Subscriber members only.
Log In Register