(EnergyAsia, May 9) — The UAE needs to double its electricity production by 2010 and expand installed capacity by 6,000 MW from the present level of 12,800 MW to meet fast-rising demand for power. According to the Khaleej Times, Ahmad Humaid Al Mazrouie, director general of the General Exhibition Corporation (GEC), that will co-host next…
UAE: Need to double power output by 2010
Posted on May 9, 2005 by EnergyAsia