in Vietnam, said its majority owned subsidiary, Cavico Hydropower Construction, has achieved a breakthrough on the headrace tunnel at the Dasiat hydropower project in Vietnam. The breakthrough was achieved October 18 after 27 months of work. The headrace tunnel is 1.44 miles long and 91 inches in diameter. Cavico Hydropower provided construction services and supplied…

This article is for Subscriber members only.
Register
Already a member? Log in here